Compliance Readiness Dashboard
Portfolio view of the five pilot battery types tracked against EU 2023/1542 and the seven Phase 1 work packages.
—
Days to Feb 2027 passport deadline
5
Pilot battery types
7
Work packages
Item
Passport granularity (per item)
Avg. readiness
48%
across 5 pilot types
Data fields mapped
62%
of required DPP fields
Open data gaps
23
8 high priority
Blocked tasks
4
awaiting supplier data
Readiness by pilot type
Completion by work package
Pilot type status
| Pilot type | EU category | In passport scope | Readiness | Carbon footprint | Status |
|---|
Type names are placeholders; the five selected models are confirmed at the Kick Off and the July workshop.
Battery Passport
Item level passport record with data completeness and the tiered, permission based access model (Article 77). The registry indexes the identifier; the full data is stored decentrally.
Viewing passport for:
Draft · pilot
Unique identifier—
Model / type—
EU category—
Economic operatorACME Batteries
Manufacturing sitePlant 1 · EU
Registry statusPending registration
Data completeness by group
Overall completeness: —
Tiered access (permission based)
PublicOpen via data carrier: identity, general info, carbon class, recycling guidance
Legitimate interestRepairers, recyclers, buyers: composition, performance, state of health
AuthoritiesNotified bodies, regulators, market surveillance (ICSMS): full record and due diligence
Key passport fields
Nominal capacity—
Chemistry—
Carbon footprint—
Recycled content—
State of health—
Due diligence (by Aug 2028)—
Supply Chain & Due Diligence
Tier 1 to Tier 4 data collection coverage and gap tracking (WP2), aligned with the battery due diligence duties.
Tier 1 coverage
86%
12 of 14 suppliers
Tier 2 coverage
54%
data requests sent
Tier 3 coverage
28%
in progress
Tier 4 coverage
11%
raw material origin
Data collection coverage by tier
Material data status
Supplier data register
| Supplier (sample) | Tier | Material / part | Data requested | Status |
|---|
Supplier names anonymised for the demo. Real Tier 1 list is provided by the client's Procurement.
Carbon Footprint & LCA
Product carbon footprint (PCF) per pilot type and life cycle stage breakdown (WP3). Declaration dates phase in under EU acts.
Types with LCA started
3 / 5
methodology applied
Avg. PCF (demo)
78 kg CO2e/kWh
illustrative values
Primary data share
41%
rest from databases
PCF by pilot type (kg CO2e per kWh)
Life cycle stage breakdown
Carbon footprint readiness by type
| Pilot type | LCA status | PCF (demo) | Performance class | Data quality |
|---|
Values are illustrative for the platform mockup. Carbon footprint declaration and class duties phase in with EU delegated and implementing acts.
3D Battery Model — Digital Twin
Select a physical part of the battery to see the mandatory DPP data fields it feeds into the passport, with access tier and source. Drag the model to rotate.
Mapped parts
6
physical components
Mandatory fields linked
—
across all parts
Public fields
—
open via data carrier
Restricted fields
—
permission based
Drag to rotate · click a part button to highlight · illustrative model
Battery parts
—
Mandatory DPP data from this part
Each component contributes specific Annex XIII / Article 77 data; together they complete the battery passport. Model and field mapping are illustrative for the platform mockup.